When do you need to pump concrete? Pumping concrete involves mechanically delivering the screed wherever it is impossible to drive up with a concrete mixer. Thanks to it, material transport to a specific place is much faster. A concrete pump proves to be particularly necessary in the upper floors, as well as in the construction of complex buildings. In addition, the danger to which workers who would transport concrete to a certain place would be exposed is eliminated. Our company Ready Mix Concrete Blackfen provides the Concrete Pump Blackfen service. Depending on the application, stationary pumps are available, as well as caterpillars and pump pumps, which not only pump concrete but also mix it at the same time.